PINNACLE OFFICE

Solutions by trade

Same desk for concrete through steel. Pick your trade to see how Pinnacle Office carries your kind of job from takeoff to the books.

Watch the job go up

Every trade, in the order the job gets built.

Scroll to build a sample job, J-1001, one trade at a time. Each step links to that trade's page.

A sample three-story steel-frame office, built by all twenty trades

J-1001 · Sample jobReady to build

  1. 01

    Demolition

    The old building on the lot comes down. Selective demo first, then break, load and haul off.

    Excavator with shear · Jackhammer · Sledgehammer

  2. 02

    Site work

    Stake out, cut and fill to the grading plan, trench the storm line and set the structures.

    Excavator · Dozer · Plate compactor

  3. 03

    Concrete

    Footings at every column line, then the slab on grade, poured, screeded and troweled.

    Screed · Bull float · Power trowel

  4. 04

    Steel

    Columns set, beams flown, bolted up and welded, metal deck down on each floor.

    Stick and MIG welder · Grinder · Spud wrench

  5. 05

    Masonry

    The stair and elevator core goes up in CMU, laid to the line and grouted.

    Brick trowel · Mortar mixer · Line and pins

  6. 06

    Framing

    Interior walls laid out, plated and stood up, plumbed and lined.

    Framing nailer · Circular saw · Framing square

  7. 07

    Roofing

    Roof deck dried in, membrane down, parapet capped and flashed.

    Coil nailer · Hatchet · Tear-off shovel

  8. 08

    Plumbing

    Risers up the core, branch lines out to the restrooms, pressure tested before cover.

    Pipe wrench · Press tool · PEX crimper

  9. 09

    Electrical

    Panels set on each floor, conduit run to the devices, wire pulled.

    Conduit bender · Wire strippers · Multimeter

  10. 10

    HVAC

    Rooftop unit set, duct trunks hung on every floor, piping brazed.

    Manifold gauges · Vacuum pump · Duct crimper

  11. 11

    Fire protection

    Mains and branch lines hung, heads dropped, hydro tested.

    Pipe threader · Groover · Sprinkler wrench

  12. 12

    Low voltage and security

    Cable trays hung, data and security cable pulled to the IDF.

    Punch-down tool · Cable tester · Fish rod

  13. 13

    Insulation

    Exterior walls insulated and penetrations firestopped before board.

    Blowing machine · Spray rig · Insulation knife

  14. 14

    Glass and glazing

    Curtain wall frames set, glass set and sealed, water tested.

    Suction cups · Glazing tools · Caulk gun

  15. 15

    Drywall

    Board hung, taped and finished on every floor.

    Screw gun · T-square · Taping knife

  16. 16

    Painting

    Primed, cut in and rolled, accent walls to the finish schedule.

    Roller and frame · Brush · Airless sprayer

  17. 17

    Flooring

    Moisture tested, prepped and set, base and transitions in.

    Notched trowel · Tile saw · Knee kicker

  18. 18

    Solar

    Attachments and rail on the roof, modules set, wired to the inverter.

    Impact driver · Torque wrench · MC4 crimper

  19. 19

    Landscaping

    Irrigation trenched, trees planted, sod laid for the walk-through.

    Spade · Trencher · Sod cutter

  20. 20

    General contractor

    Punch list closed, final pay app out, the job closes on the books.

    Plan set · Schedule · Laser level

When the job is a whole facility · 3 port terminals

Packer Avenue Marine Terminal

Port of Philadelphia · 3301 S. Columbus Blvd., Philadelphia, PA 19148

Some jobs are a campus, not one building. Pick a building to see what a contractor needs there, trade by trade.

  • 160 acres
  • 6 berths · 3,800 ft
  • 1 ro-ro berth · 800 ft
  • 45 ft depth at MLW
  • 7 container cranes
  • 2,500 reefer plugs
  • 52 loading docks
  • Rail: CSX, Norfolk Southern, CN
3D model of Packer Avenue Marine Terminal: wharf, container cranes, container yard, warehouses, truck gates and rail

Packer Avenue Marine TerminalPick a building

    • Concrete: Wharf deck and crane-rail beam repairs, poured around tides and vessel calls
    • Steel: Bollards, fender panels and crane rail splices, welded on the waterfront
    • Electrical: High-mast lighting and power to the cranes along the berth
    • Site work: Heavy-duty paving behind the wharf for container handlers
    • Electrical: High-voltage feeds, cable reels and crane controls
    • Steel: Structural repairs and inspections on booms, legs and sill beams
    • Painting: Coatings that stand up to salt air and constant wear
    • Electrical: Feeders, distribution and receptacles for every plug
    • Steel: Rack structures and access platforms
    • Concrete: Freezer slab with heat under it so the ground doesn't freeze and heave
    • Insulation: Insulated wall and roof panels with a continuous vapor barrier
    • HVAC: Refrigeration plant, evaporators and controls
    • Fire protection: Sprinkler systems that won't freeze, such as dry or preaction
    • Roofing: Roof that keeps the cold in and the water out
    • Electrical: Power for the refrigeration plant and dock equipment
    • Framing: Interior walls for offices and inspection rooms
    • Drywall: Board and finish
    • Plumbing: Restrooms, wash-down and drains
    • HVAC: Heating, cooling and ventilation
    • Electrical: Power and lighting

Facts from PhilaPort. The 3D model is simplified and building positions are approximate.

Pick your trade

Concrete

Yards, rebar and pour days, all on one job

See concrete →

Demolition

Tear-out, haul-off and salvage, all on the job that paid for it

See demolition →

Drywall

Board, tape and finish levels, from takeoff to the last coat

See drywall →

Electrical

Devices, home runs and gear, from rough-in to trim

See electrical →

Fire protection / sprinklers

Heads, mains and branch lines, from the layout to the final

See fire protection →

Flooring

Square yards, transitions and base, from the finish plan to the punch

See flooring →

Framing / Carpentry

Studs, plates and sheathing, from the plans to the punch list

See framing →

General Contractor

Subs, scopes and the owner pay app, all on one job

See general contractors →

Glass / glazing

Storefront, curtain wall and lites, from the elevations to the caulk joint

See glass →

HVAC / Mechanical

Units, duct and startup, from takeoff to closeout

See hvac →

Insulation

Batts, board and spray foam, by R-value and by area

See insulation →

Landscaping

Plants, sod and irrigation zones, from the planting plan to the walk-through

See landscaping →

Low voltage / security

Drops, devices and cable runs, from the floor plan to the patch panel

See low voltage →

Masonry

Block, brick and mortar, counted off the elevations

See masonry →

Painting

Walls, ceilings and coats, from the finish schedule to the touch-up

See painting →

Plumbing

Fixtures, risers and DWV, from underground to trim-out

See plumbing →

Roofing

Squares, flashing and tear-off, all on one job

See roofing →

Site Work

Cut, fill and haul, from the civil sheets to the pay app

See site work →

Solar

Modules, racking and strings, from the array layout to the utility sign-off

See solar →

Steel / welding

Tons, connections and erection, from shop drawings to the final pay app

See steel →
Get early access